Villa Construction

Villa Construction

Villa contractor in Fujairah since 2005 — ground and G+1 villas built from shell to turnkey handover, to your consultant drawings and Fujairah Municipality requirements.

About This Service

Building a home is one of the biggest decisions a family makes, and the owner deserves to know from day one who is building it and how. Arabian Construction House (DAB Contracting) has been building private villas in Fujairah since 2005 — from single-storey homes to ground-plus-one (G+1) villas with an annex, boundary wall and outdoor majlis — with our own site team under the management of our engineers.

We follow the standard UAE arrangement: the owner appoints a consultant who prepares the drawings and obtains the building permit from Fujairah Municipality; we build to those drawings, and the consultant supervises the work until handover. If you have not appointed a consultant yet, we explain the steps and help you coordinate, without taking the consultant role.

How a villa project typically runs: (1) review of drawings and bill of quantities, then a detailed quotation; (2) contract signing and site handover; (3) shell works — excavation, foundations, columns, slabs and block work; (4) MEP first fix — electrical, plumbing and air-conditioning; (5) finishing — plaster, tiling, paint, gypsum ceilings, doors and windows; (6) external works — boundary wall, gates and interlock paving; (7) joint inspection with the consultant, closing of snags, then key handover and support with the completion certificate requirements.

You can choose a shell-only contract, shell and finishing, or a full turnkey villa. Duration depends on size, finishes and approval timing; a G+1 villa typically takes around 10 to 16 months from site handover. We agree a clear programme at the start and share regular progress updates. As a villa contractor in Fujairah we also serve Dibba, Masafi, Kalba and Khor Fakkan.

Villa Construction

Key Features

Ground and G+1 private villas
Shell (structure) works
Shell and finishing contracts
Turnkey villa handover
Annexes, outdoor majlis and boundary walls
Electrical, plumbing and AC installations
Coordination with your consultant
Regular progress updates for the owner

Frequently Asked Questions

Yes. Arabian Construction House (DAB Contracting) is a licensed contracting company based in Fujairah, operating since 2005, and holds ISO 9001, ISO 14001 and ISO 45001 certification. Ask us for our trade licence and company profile with your quotation.
The building permit is obtained by the consultant you appoint, based on the drawings they prepare. We provide the contractor documents the consultant needs and coordinate the site inspections during construction.
A shell contract covers the structure — foundations, columns, slabs and block work — and the owner arranges finishing separately. A turnkey contract covers everything through to finishing and external works, so you receive the villa ready to move in.
Typically around 10 to 16 months from site handover, depending on the villa size, the finishing level and how quickly approvals and owner selections are completed.
Cost depends on the area, design and specification, so we do not quote a fixed rate. Send us the drawings or the bill of quantities and we will return a detailed itemised quotation.