Residential Buildings G+5 to G+10

Residential Buildings G+5 to G+10

G+ building contractor in Fujairah: residential and mixed-use buildings from G+5 to G+10, with shops, parking and apartments, delivered by DAB Contracting.

About This Service

A residential building is an investment, and its return depends on finishing on time and on budget. Arabian Construction House (DAB Contracting) has built multi-storey residential buildings in Fujairah — including G+5, G+8 and G+10 buildings — for private investors and owners, typically with shops on the ground floor, parking and typical apartment floors above.

Our role is the main contractor. The owner consultant designs the building, obtains the building permit and the authority approvals, and supervises construction; we execute the works to the approved drawings and specifications and coordinate with the consultant at every stage.

How a G+ building project typically runs: (1) review of drawings, soil investigation report and bill of quantities, then a priced offer; (2) mobilisation, site fencing and temporary facilities; (3) excavation and foundations as per the structural design; (4) the concrete frame floor by floor, with block work following behind; (5) MEP risers and installations, fire fighting and alarm systems, and lift coordination with the lift supplier; (6) facade and internal finishing for apartments, common areas and shops; (7) testing, civil defence and utility inspections arranged through the consultant, snag closure and handover.

Duration depends on the number of floors, the basement and the finishing level; a G+5 to G+10 building typically takes around 18 to 30 months. Payments are usually linked to progress certified by the consultant, which keeps the owner protected. We serve investors in Fujairah city and across the East Coast.

Residential Buildings G+5 to G+10

Key Features

G+5 to G+10 residential buildings
Mixed-use buildings with ground-floor shops
Basements and parking floors
Concrete frame and block work
MEP and fire fighting installations
Facade and apartment finishing
Coordination with consultant and authorities
Progress-linked payments certified by the consultant

Frequently Asked Questions

Yes. Our completed work in Fujairah includes G+5, G+8 and G+10 residential buildings. You can review examples on our projects page and ask us for references.
Approvals are submitted by the project consultant. As the contractor we install the systems to the approved drawings, prepare the test records and attend the inspections with the consultant.
Yes, if the approved drawings and land use allow it. Many of the buildings we deliver combine ground-floor shops with apartments above.
A G+5 to G+10 building typically takes around 18 to 30 months, depending on the number of floors, basements, finishing level and approval timing.
Usually as an advance followed by interim payments linked to work progress certified by the consultant, with a retention released after handover. The exact terms are agreed in the contract.